Slinger High School Auditorium

In efforts to address district and community needs, Sliger School District underwent a referendum for renovations at 5 area schools. A portion of the overall referendum budget was put towards an addition and renovations at Slinger High School. Renovations include improvements to the main office, library, lecture room, special education, fitness, science, tech education, and STEM classrooms.

The project also included a new 35,890 square foot auditorium that serves the needs of the whole community. The new addition includes a lobby, stagecraft, costume shop, dressing rooms, concessions and other various support spaces. The new auditorium is connected to the existing school by an adjacent addition which will house choir and band rehearsal rooms and other music support spaces.

Performances in the auditorium are supported by a full-fly loft, orchestra pit, and LED theatrical lighting system.

Location: Slinger, WI     Project Size: 35,890 sf

Bray Architects has continually evolved to
meet the ever-changing needs of our clients.

K-12
Municipal
Higher Education
Corporate + Financial
Performing Arts
Sports + Recreation