Muskego High School Natatorium

In addition to the successful spring 2016 referendum, Muskego High School revisited a number of athletic projects and approved the design and bid of an addition and renovation to the pool.

The project consists of a complete demolition of the existing 6-lane swimming pool circa 1972. In its place a new 8-lane pool was constructed and includes increased bleacher capacity for up to 400 spectators and 200 athletes as well as two new diving boards. Finally, a new office, timing area, unisex changing/shower rooms, and ample natural light are being integrated into the new design and creates a state-of-the art facility for the students and faculty at Muskego High School.

 

Location: Muskego, WI     Size of Addition: 13,500 square feet     Size of Renovation: 2,800 square feet

Bray Architects has continually evolved to
meet the ever-changing needs of our clients.

K-12
Municipal
Higher Education
Corporate + Financial
Performing Arts
Sports + Recreation