Ashwaubenon High School

As a result of a needs analysis, exploration of potential solutions, and a village-wide survey, Bray worked closely with both the Ashwaubenon School District and Village of Ashwaubenon to develop a four-question referendum which passed in April 2014.

The referendum included a new Performing Arts Center and renovations to the Pool. These spaces are primarily used by Ashwaubenon High School but can also be utilized for community events.

The new auditorium is fully equipped with a full-fly loft, LED theatrical lighting and a seating capacity of 730. The space also includes new dressing rooms, a green room, and a connection from the existing school to the new addition.

The new 8-lane pool replaces the school’s smaller 5-lane pool and allows the school to host larger swim and dive competitions. Located above the new team locker rooms is seating for up to 500 people and offers an enhanced, elevated view of the space. This project also features the creation of a separate 1,500 square foot warm-water pool which can be used for open swim, aquatic therapy and swim lessons.

Location: Ashwaubenon, WI     Size of Auditorium: 29,088 square feet (addition and renovation)     Size of Pool: 36,375 square feet (renovation)

Bray Architects has continually evolved to
meet the ever-changing needs of our clients.

K-12
Municipal
Higher Education
Corporate + Financial
Performing Arts
Sports + Recreation